Trade Estimating

Construction Trade Estimating Services

Focused quantity and cost support for individual trades—organized from project drawings so contractors and suppliers can review scope with clearer, bid-ready information.

Introduction

Estimating organized by construction trade

Trade pages help contractors and project teams find quantity and cost support aligned to specific scopes of work.

Trade estimating breaks a project into the packages your team actually bids and buys. Instead of a single undifferentiated total, each trade page explains how quantities and cost information are developed for that scope.

Whether you need concrete volumes, electrical device counts, roofing areas, or sitework quantities, deliverables follow the drawings and specifications you provide—and the level of detail you request.

Why Trade Pages Matter

Clearer paths for bidding and procurement

Trade-level clarity

Scope is organized the way trades work—by material, assembly, and count—so review is faster during bidding.

Drawing-based quantities

Measurements and counts start from the plans and specs you share, with assumptions noted when documents leave gaps.

Flexible depth

Request a focused takeoff, a cost-backed estimate, or both depending on how your team prices work.

Aligned deliverables

Formats and groupings can follow CSI divisions, locations, or your preferred bid sheet structure when requested.

Connected Services

Pair trade estimating with core services

Most trade requests connect to takeoffs, cost estimating, or bid support.

Construction Cost Estimating

Accurate residential, commercial, industrial, and public project cost estimates.

View service

Material Takeoffs

Detailed material quantity identification from drawings and specifications.

View service

Quantity Takeoffs

Precise quantity measurement for materials and labor where applicable.

View service

Bid Support

Estimate organization and bid preparation support for GCs and subcontractors.

View service
FAQ

Trade estimating questions

What is trade estimating?
Trade estimating focuses on one construction discipline—such as concrete, electrical, or roofing—measuring quantities and organizing cost information from the drawings and specifications for that package.
Do I need a full project estimate or a single trade?
Either works. Many teams request one trade for a bid deadline, then expand to additional packages as drawings and awards progress.
What documents are required?
Architectural, structural, MEP, and civil sheets relevant to the trade, plus specifications and any addenda. Clearer documents reduce assumptions in the deliverable.
How are exclusions handled?
Exclusions and open items are documented when scope is unclear or when a category is outside the requested deliverables.
Can multiple trades be combined?
Yes. Related trades can be packaged together when you want coordinated quantities across connected scopes.